Iron ore · Steelmaking routes

Iron Ore for Steel Production

There is no single 'steelmaking iron ore' specification. The buyer must identify the ironmaking route and burden/feed form, then set chemistry, size, moisture, physical/metallurgical tests and commercial terms for that route.

Mineralogy, not a gradeFe₂O₃ dominance tells you the iron-bearing phase. It does not set your Fe figure, impurities, sizing or moisture.
Evidence, not the labelComparability comes from lot-specific assay, moisture and size data, each with a named method and basis.
Route, not assumptionThe intended process route decides which physical and metallurgical tests are relevant to your acceptance.

Free, no-obligation specification review Price on request Response within one working day

Operating requirement and failure-risk map

Why the route has to be settled first

There is no steelmaking iron ore specification that stands on its own. Each requirement below is a constraint imposed by the ironmaking route the material enters, and the same ore can satisfy one route and fail another. Settle the route, and the qualifying fields follow from it.

Burden requirement with why the furnace constrains it, the failure consequence, applicability or limitation, verification requirement, and resulting RFQ field
RequirementWhy the route constrains itConsequence if unmetApplicability / limitationVerification requirementRFQ field
Ironmaking route identifiedEvery downstream requirement — form, sizing, test set — is derived from the route, not from the ore itself.Without a named route the enquiry cannot be qualified at all; two offers can look comparable while answering different questions.Blast furnace, shaft direct reduction, and agglomeration-linked use each impose a different specification on the same material.State the route and the plant context before any field is assessed.Name the ironmaking route and the plant that will receive the material.
Feed formEach route accepts a specific set of forms — a shaft takes lump or pellets, a blast furnace takes a prepared burden, agglomeration takes fines.A form the route does not accept is not a quality shortfall but a route mismatch, and cannot be charged at all.Fines and concentrate qualify for agglomeration but not directly for a shaft. The acceptable set follows the route.Confirm the form against the intended route, not against the offer's chemistry.State which form the intended route accepts.
Size distributionIt governs gas flow — through a burden, a packed bed, or the fineness an agglomeration step requires.A distribution unsuited to the route restricts gas flow, disturbs the bed, or fails the agglomeration step outright.A distribution that suits one route can be unusable in another. The acceptable range is route-specific.Screening or laser method, named, with cut points reported.State the accepted band or fineness for the route, and require the method.
Gangue (SiO2 / Al2O3)Gangue dilutes the feed and consumes energy without contributing iron, and its effect differs by route.Higher energy per tonne of metal, more slag on smelting routes, or a reduced-grade product that does not meet the intended output.Plant- and route-specific. The same figure can be acceptable in one operation and not in another.Assay per the agreed method, on a stated basis.Enter your plant's own limits, not an assumed range.
Residuals (P / S)Residuals carry into the finished steel, and how tightly they are constrained depends on the route and the grade being made.A residual outside what the melt shop accepts forces correction downstream or restricts the grades that can be produced.Sulphur is typically constrained more tightly where no slag phase removes it. Limits follow the grade, not the ore.Assay per the agreed method; set against the steel grade, not the ore.State the maximum for each residual your route and grade require.
Physical behaviourMaterial is handled repeatedly and then loaded into the process under load, and each route loads it differently.Degradation creates fines that restrict gas flow or alter the feed the route was designed around.Lump material in a shaft or burden is most exposed; an agglomeration feed is judged on fineness instead.Named degradation, strength or abrasion test, method stated.Name the physical test required for the form and route.
Metallurgical behaviourReduction behaviour is measured differently for each route, and the tests are not interchangeable between them.Feed that behaves outside what the route expects forces compensation in gas consumption, temperature or throughput.Blast-furnace and shaft-DR tests are distinct methods. Agglomeration routes are judged on fineness and binder behaviour instead.Named test method appropriate to the route (e.g. ISO 4695 for BF, ISO 11258 for shaft DR).Name the metallurgical tests your route specification calls for.
MoistureIt determines how wet and dry tonnage reconcile on the commercial basis, across every route.Mass basis disputes and delivered cost per dry tonne that does not reconcile.Depends on handling and weather as well as the deposit; the determination point matters.Named moisture determination method, with the basis stated.State the moisture basis and the determination point.
Sampling basisEvery figure above is only as defensible as the sample it was produced from.Results that cannot be reproduced or defended at your hold point.Applies to the lot as sampled under the agreed regime, not to the source generally.Sampling standard named (e.g. ISO 3082) and any witnessing party agreed.Name the sampling basis and any inspection party.

No plant limits are published on this page. Every acceptance limit above belongs to your plant, your route and the product you make. This page maps what each route constrains and what has to be evidenced; it does not supply the numbers, and no figure on it should be read as an acceptance criterion.

What qualification actually requires

A feedstock is qualified against a named route when every field that route constrains is stated and evidenced. Chemistry on its own never qualifies a material, because the binding constraints are frequently physical or metallurgical — and they differ by route.

  • Chemistry is necessary, not sufficientAn offer can carry acceptable chemistry and still fail on sizing, degradation behaviour or reducibility. The fields interact; they cannot be assessed one at a time.
  • Physical and metallurgical evidence is separateDegradation and reduction tests answer different questions from an assay, and they are requested separately. Treat them as distinct line items in the enquiry.
  • The route comes first, then the formIdentify the ironmaking route before assessing any field. The accepted form follows from it: lump and pellets suit different routes from fines and concentrate, and a well-specified material for the wrong route is still a mismatch.
Inspection setup for checking Iron Ore for Steel Productions sample, size and quality documentation.
Sampling and inspection setup. No certificate data, test values or results are shown, and none are implied for any lot.

Specification and RFQ builder

Steelmaking Route-to-Feed Selector

Enter what your enquiry actually says. The checker reports whether the evidence behind it is complete enough for two offers to be compared — it does not rank quality, score suppliers or claim availability.

Your offer or requirement

Fields left blank are reported as unresolved rather than filled in. Nothing is defaulted on your behalf.

Incomplete

Not yet comparable across offers

A grade label states a commercial band. Until the analytical Fe method, the tolerance and the sampling basis are stated — and the label is not being used as a stand-in for a full acceptance schedule — any comparison would rest on an assumption about the material rather than on evidence.

Conflicts found

  • The ironmaking route is not stated. Form, sizing and the required test set are all derived from the route, so nothing below can be qualified until it is named.

Evidence checklist

  • Fe basis stated (wet or dry) — not yet satisfiedNo Fe basis given — this alone blocks a comparable result.
  • Fe value present — not yet satisfiedThe Fe figure itself must be stated, not merely its basis.
  • Buyer chemistry limits set by you — not yet satisfiedSilica, alumina, phosphorus and sulphur limits come from your plant and product. This tool supplies no defaults and no tolerances.
  • Physical test evidence named — not yet satisfiedStrength, abrasion, degradation or fineness data, with the method behind it. A feed is qualified on behaviour, not on chemistry alone.
  • Metallurgical test evidence named — not yet satisfiedReducibility and metallization where your plant specification calls for them, with the test method named.
  • Moisture basis stated — not yet satisfiedWet and dry tonnage only reconcile when the basis is named.
  • Moisture value with unit — not yet satisfiedThe figure must carry the basis it is reported on.
  • Size distribution stated — not yet satisfiedAgglomeration and reduction behaviour both depend on it.
  • Size determination method named — not yet satisfiedA range without a screening or laser method cannot be reproduced at receipt.
  • Sampling and inspection basis named — not yet satisfiedHow the lot is sampled, and who witnesses it, determines whether the assay is accepted at the hold point.
  • Process route identified — not yet satisfiedThe intended route decides which physical and metallurgical tests are relevant.
  • Commercial and destination inputs stated — not yet satisfiedQuantity, destination and Incoterm are what make two offers comparable rather than merely descriptive.
  • Documents requested rather than assumed — not yet satisfiedCOA, moisture, size and inspection documents are each a separate request.

Missing inputs (15)

  • Fe target with its wet or dry basis — the single field that decides whether two offers are comparable.
  • Buyer-defined chemistry limits for SiO₂, Al₂O₃, P and S. Your plant sets these; this tool supplies no defaults.
  • Moisture basis — determines how wet and dry tonnage reconcile and how price per ton is compared.
  • Size distribution — governs how the material behaves in your receiving process.
  • Size determination method — without it the distribution cannot be reproduced at receipt.
  • Sampling and inspection basis — how the lot sample is drawn and who witnesses it.
  • Intended process route — it determines which physical and metallurgical tests your feed actually has to satisfy.
  • Product form — confirm the enquiry is for the form you actually need.
  • Quantity and cadence — the basis the quotation will be compared on.
  • Destination port or place — determines the delivery leg and document set.
  • Incoterm and named place.
  • Intended ironmaking route — blast furnace, shaft direct reduction, or agglomeration. Every downstream requirement is derived from it.
  • Required physical test evidence — compressive strength, abrasion or degradation data your plant specification calls for, with the named method.
  • Required metallurgical test evidence — reducibility and metallization, and any clustering or reduction-disintegration test your plant calls for, with the named method.
  • Required documents — COA, moisture, size and inspection reports are requested, not assumed.
Go to the RFQ form

Scale: completeness and basis only. No quality score, no supplier ranking, no availability or compliance claim — completing this form does not establish that any material is available or compliant.

Send the evidence for review

The summary travels with your enquiry exactly as entered. Anything still unresolved is listed as an open question rather than normalised into an assumed value. Price on request.

Response within one working day. No obligation, and no availability claim is made by submitting this form.

Price on request · Response within one working day

Fit, alternatives and selection logic

When a feed form qualifies for your route — and when it does not

A feed qualifies against a specific ironmaking route, not against steelmaking in general. Use the three states below to see where your enquiry actually sits.

Fits

A feed form qualifies when the intended route is named, the plant acceptance schedule is stated in full, and the offer answers all of it: the form matches what that route accepts, chemistry and gangue limits come from your plant, size distribution is tied to the gas-flow or fineness requirement, and the physical and metallurgical tests that route calls for are named and evidenced.

  • Ironmaking route named before the form is assessed
  • Form matches what that specific route accepts
  • Chemistry, sizing and route-appropriate test evidence stated
Verify first

This is where most steelmaking enquiries actually land. Chemistry is supplied, but the intended route is unstated — so it is not yet clear which form, sizing or test set even applies. Alternatively the route is named but the route-specific evidence is missing, or the test results are quoted without the method behind them. Either way the offer cannot be qualified, and comparing it against a fully evidenced offer is not a like-for-like comparison.

  • Intended ironmaking route not yet stated
  • Route named but its required test evidence missing
  • Sampling basis or method unstated behind the figures
Does not fit

A feed form does not qualify when it cannot meet what the intended route requires — a form that route does not accept, a size band or fineness outside what its design assumes, a gangue level that dilutes the product beyond what the plant can sell, a residual above what the melt shop accepts, or reduction and degradation behaviour outside the route's specification. These are exclusions on plant grounds, not judgements about material quality.

  • Form the intended route does not accept
  • Size or fineness outside the route design range
  • Reduction, degradation or residual behaviour outside specification

On comparing feed forms. There is no universal ranking of iron-ore forms for steelmaking, because the forms are not competing for the same slot. Lump ore suits a blast furnace burden or a shaft; pellets are a manufactured burden component with their own consistent evidence set; fines and sinter feed are agglomerated before they enter any furnace; concentrate must be pelletized first. Comparing a fine feed against a lump specification tells you nothing, because they were never interchangeable. Compare each form against the route it is intended for.

Registered alternatives, grouped by the open question

These are the registered routes that sit closest to a steelmaking feedstock enquiry. Each is a different decision, not a substitute — pick the group that matches what is still unresolved in your specification.

Representative Iron Ore for Steel Productions material arranged for specification comparison and sampling.
Representative material arranged for specification comparison. The image shows no stock volume, no readable test values and no company marks.

Standards, grades and service conditions

The fields an Fe grade figure does not carry

A grade figure fixes one field and leaves the rest open. Each parameter below is established by a method applied to a sample, and each one changes what two offers claiming the same grade actually mean when compared.

Parameter, buyer requirement, unit and basis, verification method, tolerance source, applicability and resulting action
ParameterBuyer requirementUnit / basisVerification methodTolerance sourceApplicabilityAction
Fe contentYour target with the basis stated% — dry or wet, declaredAssay by the method your contract namesYour acceptance limit, not oursApplies to the lot as sampled — the grade label does not set itState basis on the RFQ
SiO2Your process limit% — dry basis as testedAssay per the agreed methodSet by your process; gangue affects slag volume and yieldGangue content is independent of the dominant iron mineralEnter the limit explicitly
Al2O3Your process limit% — dry basis as testedAssay per the agreed methodSet by your process; affects slag viscosityNot implied by the grade figureEnter the limit explicitly
P (phosphorus)Your maximum limit% — dry basis as testedAssay per the agreed methodSet by your steelmaking routeCarries through to hot metal quality; a critical constraint on some routesEnter the maximum explicitly
S (sulphur)Your maximum limit% — dry basis as testedAssay per the agreed methodSet by your steelmaking routeRoute-dependent; more critical on direct reduction than on some sinter routesEnter the maximum explicitly
MoistureThe basis quantities are traded on% — as received or as determinedDetermination per a named moisture methodContract wording defines the adjustmentDetermines wet/dry reconciliation and the price basisState basis plus method
LOIRelevant where your route constrains it% — determination basis statedDetermination per the named methodProject or plant requirementWhere the process is sensitive to loss on ignition; some hydrated forms carry moreState requirement or mark unresolved
Size distributionThe range your route acceptsmm with stated cut pointsScreening or laser method, namedAgreed against your receiving processA coarse label says nothing about the actual distributionState distribution plus method
SamplingHow the lot sample is drawn and witnessedMethod and sampling frequencyStandards-based lot sampling regimePurchaser and supplier agree the basisDetermines whether the assay is accepted at the hold pointName the sampling basis

Evidence warning. No numeric value, tolerance or limit is published on this page for any parameter above. Ranges depend on the deposit, the product form, your process and the grade you specify, and each belongs to be stated and verified in your enquiry. Where a figure is required, request it with its unit, method and basis — a mineralogical name supplies none of them.

Physical and metallurgical parameters the process tests

Chemistry describes what the material contains. These parameters describe how it behaves in a given route, and between two offers at the same nominal grade, these are often what separates them. Each row is a request for the figure and the method behind it.

Physical and metallurgical parameters with buyer implication, unit and basis, verification method, applicability and resulting RFQ field or next action
ParameterBuyer implicationUnit / basisVerification methodApplicability / limitationRFQ field or next action
Reduction behaviourHow the feed reduces in the intended route — the test and the acceptance both depend on which route that is.Reported as a rate or degree — test basis statedDetermination per the test method appropriate to the route (e.g. ISO 4695 for BF, ISO 11258 for shaft DR)Blast-furnace and shaft-DR methods are not interchangeable, and agglomeration routes are judged on fineness insteadName the intended route, then the tests it requires
Bulk densityFeeds handling, stockpile volume and vessel stowage planning.t/m³ — as shipped, moisture statedDetermination per a named bulk density methodDepends on moisture and compaction at the time of measurementRequest the figure and its moisture condition
Loss on ignition (LOI)Relevant where the process is sensitive to mass lost on heating.% — determination basis statedDetermination per the named methodProject or plant specific; not an acceptance limit unless your contract says soState the requirement or mark it unresolved
Gangue mineralogyExplains why two offers with the same SiO2 figure can behave differently in the furnace.Qualitative or %, with the reporting basisMineralogical examination or a named testWhere a petrographic or mineralogical basis is agreed; otherwise descriptive onlyRequest only if your process is sensitive to it
Tumbler / abrasion indexSignals degradation during handling and transfer between load port and plant.Index value — test method namedDetermination per the named physical testApplies to lump or DSO material subject to repeated handling; of limited use on a fine productRequest where handling degradation is a known issue
Sinter or pellet testShows how the material performs in the specific agglomeration step rather than in general.Test-specific index — conditions statedDetermination per the agreed agglomeration testOnly meaningful where the route actually includes that agglomeration stepState the agglomeration route before requesting it

Standards that carry the verification

Two standards do most of the work in a grade enquiry: one for how the lot is sampled, one for how iron content is determined. Naming both in the contract is what makes an assay reproducible between the offer and your receipt.

Applicability boundary: these routes explain what each standard covers and where its scope ends. Neither substitutes for the edition your contract cites, and neither implies that any material meets them.

Inspection setup for checking Iron Ore for Steel Productions sample, size and quality documentation.
Sampling and inspection setup. No certificate data, test values or results are shown, and none are implied for any lot.

Quality, testing and documentation

What each document verifies — and what it does not

Documents are requested, not assumed. Each one below answers a distinct question, and none of them substitutes for your contract's acceptance basis.

Requested evidence, what it verifies, who supplies or verifies it, when it is required, and what remains quotation or project dependent
Requested evidenceWhat it verifiesWho supplies / verifiesWhen requiredQuotation / project dependency
Certificate of analysis (COA), per lotThe chemical composition the lot is accepted against — Fe plus the impurity limits your process set.Issued against the agreed assay method; the issuing laboratory is confirmed per enquiry.At the enquiry stage, as the basis for comparison.Which laboratory, and whether your contract accepts its scope, remains a project decision.
Moisture determination reportThe figure behind the wet/dry tonnage reconciliation and the commercial basis.Issued per a named moisture method; confirm it travels with the lot.Before quantity and price are compared.The method and its acceptance depend on your contract wording.
Size distribution reportWhether the material suits the process step it was specified for.Issued per the agreed size method; confirm the cut points reported.Before the material is committed to a route.Cut points and tolerances are yours to set, not to assume.
Sampling and inspection recordWhether the assay is defensible at your hold point.Issued against the agreed sampling standard and any appointed inspection party.Agreed at enquiry, not at the port.Whether a third-party inspection party is appointed is a project decision.
Physical / metallurgical test resultsHow the material behaves in your specific route, where your route requires it.Determined per the agreed test method.Only where the intended route makes the test relevant.The test set depends entirely on the process route you confirm.
Origin and shipping documentsCustoms clearance and, where applicable, origin requirements.Issued per shipment.Before dispatch.Only relevant if your project or jurisdiction imposes an origin requirement.

Availability and documentation matrix

Availability is not a property of the material — it is a statement about a specific enquiry at a specific time. This matrix sets out what would have to be confirmed before any availability statement could be made.

Availability and documentation matrix with buyer implication, applicability and limitation, verification requirement and resulting RFQ field or next action
Item to confirmBuyer implicationApplicability / limitationVerification / source requirementRFQ field or next action
Quantity available for the enquiryDetermines whether the requirement can be structured as a single lot or a repeating programme.A quantity answer is only meaningful against a stated specification, destination and period.Confirm per enquiry. No standing quantity is published on this page.State quantity, cadence and required delivery window
Delivery windowSets whether the requirement plans against production and shipping, or needs another arrangement.Requires the destination and the Incoterm to be named before any window is meaningful.Confirm per enquiry in writing against the stated Incoterm.State the required date or schedule in the RFQ
Loading and packing formChanges handling cost, stowage planning and the documents that accompany the movement.Depends on the vessel or container arrangement, which follows the destination and quantity.Confirm per enquiry against the agreed loading form.State the required loading or packing form
Product form actually offeredDetermines whether the offer is comparable at all — lump, fines, concentrate and pellet feed are different decisions.A mineralogical description does not establish form or sizing.Confirm against the offer documentation per enquiry.State the form your process requires
Sampling regime and witnessing partyEstablishes whether the assay will be accepted at your hold point.Applies to the lot as sampled under the agreed regime, not to the source generally.Confirmed against the sampling standard your contract names.Name the sampling basis and any witnessing party
Document set issued per lotDetermines whether your hold point is a check or a negotiation.Each document covers the sampled lot only — none is a general quality guarantee.Confirmed per enquiry against the requested set.Request each document explicitly in the RFQ
Origin documentation requirementNeeded for customs clearance and, where applicable, origin requirements.Only relevant if your project or jurisdiction imposes an origin requirement.Issued per shipment; confirm the set required at your destination.State your destination and any origin requirement

This page publishes no stock position, availability statement, lead time, shipping schedule, mine or mill ownership, or certification claim for any material. Every row above is a question to be confirmed per enquiry.

Evidence gates before the lot is traded

  • 1Mineralogy gateThe dominant iron mineral is recorded as context. It is not accepted as a substitute for a stated Fe basis.
  • 2Basis gateFe, moisture and size figures each carry a stated basis and method before any comparison is made.
  • 3Sampling gateThe sampling regime and any witnessing party are agreed at the enquiry stage, not at the port.
  • 4Limit gateChemistry limits come from your process and each is tied to the method that verifies it.
  • 5Route gateThe intended process route is stated, because it decides which physical and metallurgical tests apply.
  • 6Document gateEach requested document is named in the enquiry and confirmed against what the route will actually issue.

Certification limits: this section describes document types and their verification roles. It makes no claim about which certificates Noor Deira Steel holds, which party issued any prior report, or what any future lot will be certified to.

Commercial, logistics and availability inputs

What the quotation rests on — and what stays open

A quotation is only comparable when the inputs behind it are stated. Each row below names what an input changes and what remains unknown until it is confirmed.

Commercial and logistics inputs with what each changes and what stays unknown until confirmed
Quotation inputWhat it changesWhat remains unknown until confirmed
Fe basis and chemistry limitsWhich material is being priced at all, and against which acceptance limits.Nothing, once stated. Left open, it is the largest source of non-comparable offers.
Moisture basis and methodWhether quantities and price adjustments are on a wet or dry basis.The effective dry tonnage, and therefore the delivered cost per dry tonne.
Size distribution and methodWhether the material suits the receiving plant's process step.Process suitability until the distribution and its method are known.
Product formWhether the offer is lump, fines, concentrate or pellet feed — different decisions entirely.Comparability itself, until the form is confirmed against your requirement.
Quantity and cadenceWhether the requirement is a single lot or a repeating programme.The commercial structure and the shipment planning basis.
Destination port and IncotermWhich carriage legs, duties and charges sit inside the quoted figure.The delivered cost until the place and the term are named.
Loading and packing formHow the material is presented at load port and discharged at destination.Handling cost and the documents that accompany the movement.
Document setWhich evidence the lot carries and what the buyer's hold point accepts.Whether the evidence satisfies the contract until the set is named.
Delivery windowWhether the requirement plans against production and shipping, or needs another arrangement.Any statement of lead time or schedule — this page makes none.

What this page does not claim

  • No price, benchmark, discount or premium is published.
  • No stock position or availability is claimed for any material.
  • No lead time, loading rate or shipping schedule is stated.
  • No mine, mill, source origin or ownership is claimed.
  • No certification, lab accreditation or project approval is claimed.
  • No served-market, branch, warehouse or port presence is claimed.

Ready to be quoted

Complete the Evidence Completeness Checker above and send the summary. Everything unresolved travels with it as an open question rather than a silent assumption.

Registered alternatives and technical resources

Grouped by the next decision, not listed as a directory

Each group below answers a different question that follows from reading a steelmaking feedstock offer. Pick the group that matches what is still unresolved.

Expert insight

What evidence most directly changes the procurement decision here?

On a grade enquiry, the item that most often decides whether two offers are comparable is not the Fe figure itself — both will quote one — but whether the analytical method and the sampling basis behind those figures are the same.

Verify-first checklist

Work through these before comparing two offers at the same nominal grade. Each is a question the offer has to answer, not one the supplier can infer for you.

  1. 1Sample before you compareA chemistry value is only decision-grade if the lot was sampled and prepared representatively. Ask for the sampling basis before you treat any figure as comparable.
  2. 2Separate mineralogy from gradeA relative descriptor such as “high grade” states no definite figure at all. Even a numeric grade label states a commercial band, not a measured result. The measured figure, the method that produced it and the tolerance around it are separate fields your contract has to set.
  3. 3Name the methods behind every figureFe, moisture, size and any physical test are each produced by a method. The method is what makes the number reproducible at your receipt.
  4. 4Set chemistry limits from your processSilica, alumina, phosphorus and sulphur limits belong to your plant. They are not defaults and should not be assumed.
  5. 5Confirm the edition your contract citesStandard editions change. Verify the edition named in your contract rather than the one quoted in general conversation.
  6. 6Match the tests to the routeReducibility, tumbler index and agglomeration tests are only relevant if your route actually includes that step.

Buyer implication. A certificate value is only as useful as the sampling basis behind it. The RFQ should state the lot, the sampling method, the test method and the acceptance basis — rather than asking only for an Fe number.

Source record

Primary source
ISO 3082:2017 — Iron ores — Sampling and sample preparation procedures
Method
Use the published ISO scope to require representative lot sampling and sample preparation before chemistry, moisture, size distribution or physical/metallurgical results are treated as decision-grade — whichever ironmaking route the material is destined for.
Information date
2026-09-22
Scope
Mechanical and manual sampling and sample preparation for natural and processed iron ores, including concentrates and agglomerates, for lot-level determination of chemical, moisture, size and other properties.

Limitations

  • ISO 3082 defines sampling and preparation principles; it does not set commercial acceptance limits for a specific contract.
  • The 2017 edition remains the published edition but is under revision, so procurement teams should verify the edition named in the contract.
  • This is an evidence-backed decision aid, not a named-person profile, and not a substitute for the standard itself.

Evidence-led buyer advantages

What we do about the ways a grade offer misleads

Each item starts from a real concern on a grade enquiry, states the practice that addresses it, and ends at the outcome it produces. None rests on a claim about stock, origin or price that this page cannot substantiate.

Buyer concern
A grade label mistaken for a specification
What we do
We treat the grade figure as one field, not as the specification, and ask for the assay method and tolerance alongside it before comparing anything.
Procurement outcome
Offers are compared on a stated figure rather than on a descriptive name.
Buyer concern
Chemistry quoted without a sampling basis
What we do
A certificate value is only as good as the sample behind it, so we ask for the sampling and preparation basis alongside the assay.
Procurement outcome
The result is defensible at your hold point rather than arguable at it.
Buyer concern
Moisture quoted without a method
What we do
Moisture without a determination method is flagged as a conflict, because two offers quoting the same figure under different methods are not comparable.
Procurement outcome
Delivered cost per dry tonne is comparable rather than apparent.
Buyer concern
Size range with no screening method
What we do
We require the distribution and the method behind it, since the receiving process depends on both.
Procurement outcome
The material suits the process step it was specified for, rather than being discovered unsuitable at receipt.
Buyer concern
Chemistry limits assumed rather than set
What we do
Limit fields stay empty until you set them. The tool supplies no defaults and no tolerance limits.
Procurement outcome
The acceptance criteria on the enquiry are yours, and the same criteria apply to every offer compared.
Buyer concern
Evidence requested too late
What we do
The document set is named in the enquiry and each document is tied to what it verifies.
Procurement outcome
The hold point is a check against an agreed set rather than a negotiation.

Advantages describe procurement practice. They make no claim about stocking position, mine or mill ownership, origin, delivered tonnage, pricing position or certification status.

From enquiry to delivery

Who owns what, at every stage

A grade order moves through defined stages. Each stage below names the concern it resolves, who owns it, what has to be supplied, what comes out of it, and the risk if it is skipped.

Workflow stages with buyer concern, owner, required input, output, risk and next action
StageBuyer concernOwnerRequired inputEvidence / outputRisk if skippedNext action
Enquiry issuedOffers cannot be compared on a stated basis.Buyer / procurementForm, Fe basis, chemistry limits, moisture basis, size basis, route.A comparable enquiry record.Suppliers quote on different bases.Run the Evidence Completeness Checker.
Mineralogy vs grade separatedA descriptive name is being treated as a specification.Buyer / technical sourcingThe mineralogical description and the contractual grade field, stated separately.A requirement expressed in contractual fields.The enquiry quietly becomes a comparison of labels.Restate the requirement in grade, basis and limits.
Specification validationA figure without a method cannot be verified.Buyer / plant metallurgistAssay, moisture and size methods named.Basis resolved and stated.Assays cannot be reproduced at receipt.Close the missing evidence.
Evidence reviewThe documents must satisfy the contract.Supplier and appointed inspection partySampling regime and required document set.COA, moisture, size and inspection records.The hold point becomes a negotiation.Confirm against the agreed set.
Commercial basisPrice and quantity must rest on one basis.Buyer / supplier commercialMass basis, quantity, cadence and Incoterm.Quotation on a stated basis.Wet and dry quantities cannot be reconciled.Agree the basis in writing.
Destination and logisticsThe movement must match the contract.Supplier / carrierPort or place, Incoterm, loading form, documents.Shipping and customs document set.Documents missing at the destination.Confirm the document set before loading.
RFQ handoffThe resolved basis must reach the supplier intact.BuyerThe complete evidence summary.A transmittable RFQ summary.Fields lost or normalised silently.Send the summary as entered.

Buyer FAQ

Questions that come up once offers are on the table

These are the questions traders, steel-plant buyers and procurement analysts raise once an offer exists — not what a grade figure means, but what has to be pinned down before two offers can be compared.

Which iron ore forms can be considered for steelmaking?

Steelmaking is not one route, so the answer depends on which ironmaking step you are feeding. A blast furnace charges lump, sinter and pellets; a shaft direct-reduction plant accepts only lump or pellets; a sinter or pellet plant takes fine feed and agglomerates it first. Fines and concentrate are therefore qualifying forms for some routes and excluded from others. Establish the route first — the acceptable form follows from it, and the evidence set changes with it.

How should Fe grade and impurity limits be verified?

Because the constraints that matter differ by route. On a blast furnace the binding fields include gangue and its effect on slag volume and coke rate. On a shaft, reducibility and metallization govern, and sulphur is constrained more tightly because no slag phase removes it. Across all of them, residual elements carry into the finished steel, so their limits follow the grade being made rather than the ore. An Fe figure speaks to none of this on its own.

Why should moisture and size distribution be stated with a test basis?

Size distribution governs whether the material can be used in the intended route at all — a blast furnace needs a burden whose permeability supports gas flow; a shaft needs a bed it can pass reducing gas through; a sinter or pellet plant needs a fine feed of the right fineness. A distribution that suits one route can be unusable in another. Moisture separately determines how wet and dry tonnage reconcile. Both need a named determination method.

Which quality and inspection documents should be requested rather than assumed?

Name the chemistry and sizing fields, then the tests your route requires. A blast furnace typically calls for degradation and strength data alongside reducibility; a shaft calls for reducibility and metallization under shaft conditions; an agglomeration route is governed by fineness and binder behaviour rather than by reduction tests. The sets are not interchangeable, and each test must be tied to a named method. Then request the certificate of analysis, moisture report, size distribution report, sampling and inspection record, and shipping documents.

Which commercial and delivery inputs are needed for a comparable RFQ?

Quantity and cadence, the mass basis the quotation is priced on, the destination port or named place, the Incoterm, the loading or packing form, the document set and the required delivery window. Beyond those, the inputs that make the offer qualifiable: which ironmaking route it is destined for, which form is offered, chemistry and gangue limits, size distribution, moisture basis, and the physical or metallurgical test results that route requires. Without the route and the test set, the quotation describes a material rather than qualifying it.

Qualified RFQ

Request a quote for Iron Ore for Steel Production

Send the feed form, chemistry limits, size distribution, quantity, destination and required delivery date. Every unresolved item — the metallurgical test evidence, the sampling basis, the moisture determination — is listed back to you as a question rather than filled in on your behalf.

Free, no-obligation specification review · Price on request

Contact the commercial department

Unresolved verification items travel with this RFQ. If the basis, method or document level is still open, it is listed as a question rather than assumed.

Application requirements

Where the process route changes what you must specify

Direct reduction is one destination for iron ore; the routes around it impose different requirements on the same material. These are the registered application and industry routes, and what each one shifts in your acceptance criteria.

Direct reduction (DRI)

Operating condition
Reduction of ore to metallic iron without a melting step, where behaviour in reduction governs.
What shifts in the specification
Reducibility and metallization become governing, and sulphur is constrained more tightly because no slag phase removes it.
Why routes are not interchangeable
A feed qualified for a blast furnace is not automatically suitable for a shaft, even at the same Fe figure.
iron ore for direct reduction

Blast furnace burden

Operating condition
Burden components where chemistry, gangue and physical form together determine furnace performance.
What shifts in the specification
Gangue content and its effect on slag volume and coke rate become procurement-relevant.
Why routes are not interchangeable
A requirement set for a shaft-DR feed is not automatically suitable for a blast furnace, even at the same Fe figure.
iron ore for blast furnace

Pelletizing feed

Operating condition
Fine feed agglomerated into pellets with defined physical properties before it enters a burden.
What shifts in the specification
Fineness, size distribution and binder behaviour govern, since pellet quality depends on the feed going in.
Why routes are not interchangeable
A concentrate sold to a sinter plant is not automatically a pelletizing feed — the fineness requirement differs.
iron ore for pelletizing

Integrated mills

Operating condition
Sites operating their own agglomeration and ironmaking chain with internal specifications.
What shifts in the specification
The plant's own internal spec governs, and your enquiry has to reflect it rather than a general grade.
Why routes are not interchangeable
An integrated mill sets its own acceptance basis; a trader buying to re-sell may not.
iron ore for steel mills

Pellet plants

Operating condition
Plants converting a fine concentrate feed into pellets for external sale or internal use.
What shifts in the specification
Feed consistency between shipments matters as much as the absolute values, because the pellet grade depends on the concentrate going in.
Why routes are not interchangeable
Variance across lots is a procurement issue here, not just the mean figure.
iron ore for pellet plants

Recommended products

Which iron-ore products suit a steelmaking route

These are the registered product routes that feed a steelmaking chain, directly or through an agglomeration step. Which of them applies depends on the route you are feeding, so treat this as a map rather than a shortlist.

Recommendations describe which product routes suit which steelmaking step in principle. They make no claim about stock, origin, availability or pricing for any material.

Operating conditions

How the route environment changes what you specify

Each ironmaking route imposes its own operating conditions — a burden that must stay permeable, a packed bed that must pass reducing gas, an agglomeration step that must accept the fineness. Each condition is what makes a particular field procurement-relevant rather than incidental.

Continuous operation raises the cost of variability

A furnace is not restarted between lots. Inconsistency between shipments forces operational compensation, which is why feed consistency is specified alongside the mean figures — particularly on sinter feed and pellets.

RFQ action: State whether consistency between lots is an acceptance criterion and over what period.

Gas flow through the feed is a design constraint

Whether gas passes through a burden or a packed bed, the size distribution governs the pressure drop and the distribution of gas through the material. This is the field most often under-specified on a chemistry-led enquiry, and it cannot be inferred from an assay.

RFQ action: Require the size distribution or pellet dimension with its method, and any degradation test your route relies on.

Reduction behaviour is measured, not assumed

How the feed reduces is established by a named test appropriate to the route — not a property implied by Fe content or mineralogy. The methods differ between smelting and shaft direct reduction, and a result from one does not answer for the other.

RFQ action: Name the intended route, then the reduction tests that route specifies.

Moisture moves with handling and weather

The material is loaded, carried and discharged over days or weeks. Moisture shifts across that passage, which is why the basis and the determination point belong in the contract rather than in an assumption.

RFQ action: State the moisture basis, the determination method and the point at which it applies.

Handling degrades lump material

Transfer through grabs, hoppers and conveyors breaks down coarse material, and the shaft then loads it into a bed under its own weight. Degradation creates fines that restrict gas flow and disturb the bed the process was designed around.

RFQ action: Where handling degradation is a concern, require the physical test that measures it for the form offered.

Residuals carry into the metal

Phosphorus and sulphur are not removed easily downstream, so their limits follow the steel grade being made rather than the ore itself. Two plants can accept different maxima from the same material.

RFQ action: Set residual limits from the grade you are producing, and state them explicitly.

QA and compliance

What has to be evidenced before the feed is qualified

Qualification is an evidence exercise, not an assertion, and what counts as evidence depends on the route. Each item below is a check that either passes, fails, or remains open — and an open item keeps the offer out of the comparison rather than being assumed in its favour.

Qualification check with what it confirms, who supplies it, when it is needed, and what remains plant or contract dependent
Qualification checkWhat it confirmsSupplied / verified byWhen requiredRemains plant or contract dependent
Feed form accepted by the routeThat the form offered would enter the intended route as delivered, rather than requiring preparation the plant cannot perform.Buyer, against the route and plant design.Before any comparison is made.Which forms the route accepts, and whether the plant has agglomeration capacity.
Chemistry within plant limitsThat gangue and residuals sit inside what the plant and the product it makes accept.Assay per the agreed method; limits set by the buyer.At enquiry, as the basis for comparison.The limits themselves — they are never supplied by this page.
Size distribution or finenessThat the feed suits the gas flow, bed or agglomeration step the route was designed around.Issued per the agreed screening, dimension or fineness method.Before the material is committed to a route.Cut points, dimension range and fineness targets are the plant's to set.
Physical test evidenceThat the feed survives handling and bed loading without degrading past the specified band.Named strength, abrasion or degradation test, method stated.Where the plant specification calls for it.Which test applies depends on whether the form is lump or pellets.
Metallurgical test evidenceThat the feed reduces as the intended route expects.Named test method appropriate to that route, stated with the result.Where the plant specification calls for it.Acceptance limits remain plant, route and product specific. Reduction methods are not interchangeable between routes.
Sampling basis agreedThat every figure above is defensible at the hold point.Buyer and supplier, against a named sampling standard.Agreed at enquiry, not at the port.Whether a third-party inspection party is appointed.
Moisture basis and methodThat wet and dry tonnage reconcile on the commercial basis.Issued per a named moisture method.Before quantity and price are compared.The determination point and adjustment wording are contract matters.

No certificate, accreditation or approval is claimed on this page. This section describes what has to be evidenced in general terms and makes no representation about which documents Noor Deira Steel issues or holds.

Procurement checklist

What to have settled before you request a firm quote

A steelmaking enquiry that names its route and arrives complete is quoted once. One that arrives with the route unstated, or the route-specific evidence still open, is quoted as a description and clarified afterwards — which costs time on both sides.

  1. 1Name the route, then the formState which ironmaking step the material feeds, then the form offered. Confirm the route accepts that form without preparation the plant cannot perform.
  2. 2Set your own chemistry limitsEnter SiO2, Al2O3, P and S limits from your plant and the product you make. Do not accept a supplier's assumed range as your specification.
  3. 3State the size band and the methodGive the accepted distribution with the screening method behind it, so the figure can be reproduced at receipt.
  4. 4Name the physical testSay which strength, abrasion or degradation test your plant relies on for the form offered, and require the method alongside the result.
  5. 5Name the metallurgical testsName the reduction tests your route specifies — the method differs between smelting and shaft routes — plus any clustering, reduction-disintegration or agglomeration requirement, with a method for each.
  6. 6Fix the sampling and moisture basisName the sampling standard, any witnessing party, and the moisture determination method and point of application.
  7. 7State the commercial frameQuantity and cadence, destination port or place, Incoterm, loading form, document set and delivery window.

The fields that most often delay a quote

On steelmaking enquiries these are the items that come back as questions rather than as prices. Settling them first removes a full round of correspondence.

  • The size distribution without its screening method
  • Chemistry supplied with no sampling basis behind it
  • Physical test results quoted without a named test
  • Reducibility required by the plant but not requested in the enquiry
  • Moisture given as a figure with no basis or determination point
  • Destination and Incoterm left to be inferred from the address
Go to the RFQ form

Logistics

Destination changes the documents and the delivery, not the feed

A qualified feedstock travels the same way wherever it ships. What changes by destination is the documentation set, the delivery location, the customs route and the delivery term the quotation must reflect.

AE flagUnited Arab EmiratesEnquiries landing at Jebel Ali, Khalifa Port or a free-zone consignee need the delivery place named before the Incoterm means anything. State the port or free zone, and whether the receiving plant or the trader takes the customs entry.iron ore supplier UAE SA flagSaudi ArabiaShipments into Dammam or Jeddah typically move on to inland industrial cities, so the quotation has to reach the inland place rather than stop at the port. Say whether the rail or road leg sits inside your requirement, and which conformity documents your consignee needs.iron ore supplier Saudi Arabia QA flagQatarHamad Port consignments are usually cleared against a document set agreed in advance. Name the consignee, the delivery place and whether the receiving plant requires the assay and moisture documents before discharge rather than after.iron ore supplier Qatar KW flagKuwaitShuwaikh and Shuaiba movements are short-sea legs, so the packing or loading form affects handling more than the voyage. State whether the requirement is containerised or breakbulk, because it changes the documents and the discharge arrangement.iron ore supplier Kuwait BH flagBahrainKhalifa Bin Salman Port deliveries often connect to a mainland industrial consumer, so the delivery place may not be the port itself. Name the final place and the Incoterm that reaches it, and confirm whether the entry is taken by your consignee or a broker.iron ore supplier Bahrain OM flagOmanSohar and Duqm consignments sit close to industrial zones where the receiving site may take delivery directly. State the port or zone, the delivery term that reaches it, and whether origin documentation is a requirement for your end use.iron ore supplier Oman

These are destination planning routes. They describe the logistics and documentation inputs each destination changes. They make no claim that Noor Deira Steel holds stock, a branch, a warehouse or a port presence in any market listed.