Technical Resource

Scaffolding Pipe Dimensions Chart

A dimensions chart is only decision-grade when every row names the standard and revision it came from, the dimensional basis it uses, its units, and where its tolerance is sourced. Mixing nominal outside diameter, actual measured diameter, wall and length across different standards in one unlabelled table is the most common way a scaffold tube order goes wrong — the numbers look comparable and are not. The normalizer below tags each entry with its source before it will compare anything.

Free, no-obligation technical review

Information current as of

Send these inputs

  • Standard + revision
  • Outside diameter + unit
  • Wall thickness + unit
  • Length + unit
  • Tolerance source
  • Finish allowance
  • Coupler standard
  • Destination / named place

Working technical tool

Scaffold Tube Dimension Normalizer

Enter the dimensions you have and tag each one with its source. The normalizer holds nominal and actual values apart, refuses to convert units on your behalf, generates no tolerance it was not given, and reports what is missing rather than filling it in. It produces a comparison-safe row and a copyable specification line.

Step 1 — Dimensions and their sources

Outside diameter *

Wall thickness *

Length *

Values are recorded exactly as entered. Nothing is converted, rounded or defaulted, and no tolerance is generated. An unknown field is reported as missing.

Step 2 — Normalized result

Not yet normalized

Add the required fields to normalize this row.

Missing: Standard + revision, Outside diameter, Outside diameter unit, Outside diameter basis (nominal or actual), Wall thickness, Wall unit, Length, Length unit, Tolerance source, Coupler standard, Finish / coating. Nothing is defaulted in their place; the row is held as incomplete until each is supplied.

Missing fields (11)

  • Standard + revision
  • Outside diameter
  • Outside diameter unit
  • Outside diameter basis (nominal or actual)
  • Wall thickness
  • Wall unit
  • Length
  • Length unit
  • Tolerance source
  • Coupler standard
  • Finish / coating

Conditions limiting comparison

  • No tolerance source. Outside diameter, wall and length each carry their own permissible variation, set by the governing standard. Without a cited source the entries have no defined acceptance limits and cannot be marked comparable.
  • No coupler standard. The interface is the reason the diameter matters — without the coupler reference, the outside diameter is being recorded but not checked against anything.

Normalized fields

Standard + revision
not stated
Outside diameter
not entered
Outside diameter basis
not stated
Wall thickness
not entered
Length
not entered
Tolerance source
not stated
Coupler standard
not stated
Finish / coating
not stated
Unit system
not stated

Comparison-safe

  • Nothing yet — no field has a source behind it.

Not yet safe to compare

  • Standard and revision — every dimension needs a source before it can be compared.
  • Outside diameter — needs a value, a unit and a stated basis (nominal or actual).
  • Wall thickness — needs a value and a unit.
  • Length — needs a value and a unit.
  • Tolerance source — the permissible variation for OD, wall and length.
  • Coupler standard — the interface the diameter is checked against.
  • Finish / coating — decides whether the presented diameter differs from the bare one.

Assumptions and method

  • Values are recorded exactly as entered. Nothing is converted between units and no figure is rounded.
  • Nominal and actual values are held in separate fields and are never averaged or treated as equivalent.
  • No tolerance value is generated, inferred or defaulted. Where none is supplied, the dimension is reported as having no defined limits.
  • No standard, grade, coating or destination is assumed on the buyer's behalf.
  • A normalized row is a comparison aid. It is not engineering approval and does not establish that any scaffold is adequate for its access.

Copyable specification line

SCAFFOLD TUBE DIMENSION LINE
Standard + revision: TO CONFIRM
Outside diameter: TO CONFIRM (basis TO CONFIRM)
Wall thickness: TO CONFIRM
Length: TO CONFIRM
Tolerance source: TO CONFIRM — no limits can be applied without it
Coupler standard (interface): TO CONFIRM
Finish / coating: TO CONFIRM
Basis: nominal and actual values kept separate; no conversion and no tolerance inferred.
Status: comparison aid only — not an engineering approval.
Transfer this into the RFQ

The normalized row is carried into the enquiry form as the specification line above — nothing you entered is discarded.

Method, formula and data conditions

Six rules that keep a chart decision-grade

The method is not a formula — it is a set of conditions. Each rule below exists because breaking it produces a table that looks authoritative and is not. The unit system is whatever you state, and it is never converted silently.

Rule 01

Fix the source before the number

A dimension with no standard and revision attached cannot be compared to anything. The source is recorded first, and a row without one is reported as missing rather than filled in.

Rule 02

Separate nominal from actual

A nominal figure is a designation. An actual figure is a measurement and only exists at a point in time, against an instrument. The normalizer keeps the two in different fields so they are never averaged together.

Rule 03

Attach the tolerance basis

Outside diameter, wall and length each carry their own permissible variation, set by the governing standard. The tolerance source is a mandatory field, because a dimension without one has no defined limits.

Rule 04

Account for the finish

A coating adds to the outside surface. Where one applies, the diameter the coupler meets is the presented diameter, not the bare one — and the two are recorded separately.

Rule 05

Check against the interface

The coupler standard is the interface reference. Chart data is only useful if the distinction between interface dimensions and product-standard tolerances is preserved end to end.

Rule 06

State what the chart is not

A normalized row is a comparison aid. It is not an engineering approval, not a certificates substitute, and not a claim that a scaffold built from the component is adequate.

Source hierarchy

The governing standard first — that is where dimensions and tolerances come from. The coupler standard next, as the interface reference. Manufacturer data only where an authorized source publishes it for the specific product.

Applicability

A chart row applies to the standard, edition and product form it was recorded from. Carried to a different standard or a different product form, the same numbers stop describing the same thing.

Limitations

No numerical tolerance, unit weight, load capacity or dimensional limit is published on this page. Each is set by the standard that governs your supply, and the page states the input to supply instead of asserting a figure.

Procurement-grade worked examples

Three situations that recur on scaffold tube enquiries

Each example shows the input, the method applied, the result, what it means, what it changes and how to verify it. No company, project or supplier data is used or implied.

1

Two offers, same stated diameter

Input

Two quotations both state a 48.3 mm outside diameter. Neither states a tolerance basis or the standard the figure came from.

Method applied

The normalizer holds both rows as outside diameter = 48.3 mm with an empty tolerance source. It refuses to mark them equivalent, because equality of a nominal value is not equality of a toleranced dimension.

Result

Comparison status: not comparable. Both rows return a missing-source warning against the tolerance field rather than a match.

Interpretation

The numbers agree; the dimensions do not yet exist as comparable quantities. Nominal equivalence says nothing about what the coupler will actually close on.

Decision impact

Buying on the nominal figure alone can produce tube that assembles differently from the sample the design was checked against.

Verification step

Ask both suppliers for the tube standard with its edition and the tolerance basis for outside diameter and wall, in writing, before comparing the offers.

2

A measured diameter against a nominal design figure

Input

A site measurement records an outside diameter of 48.4 mm on delivered tube. The design references a nominal 48.3 mm.

Method applied

The measured value is recorded in the actual field and the design figure in the nominal field. The normalizer will not treat the difference as a deviation, because no tolerance limits have been supplied to judge it against.

Result

Comparison status: needs a tolerance source. The difference is displayed as an unresolved quantity, not as a pass or a fail.

Interpretation

Whether 48.4 mm is within permissible variation depends entirely on the limits in the governing standard and the instrument used. Neither is present yet.

Decision impact

A site decision made on the raw difference — accepting or rejecting the consignment — would be made without the limits that define acceptance.

Verification step

Take the permissible outside-diameter variation from the accepted tube standard and the measurement uncertainty of the instrument, then compare the measured value against those limits.

3

Two standards described by one grade

Input

Two tube offers are described only by a steel grade designation. The dimensional and tolerance regimes behind them are not stated.

Method applied

The normalizer treats the grade as one field. It leaves the standard/revision field empty rather than inferring a standard from the grade.

Result

Comparison status: not comparable. The row is complete on grade and incomplete on standard, dimensions and tolerance source.

Interpretation

A grade is a strength basis. It does not carry dimensions, tolerances or a product form, so two offers matching on grade have not been shown to match on anything the coupler meets.

Decision impact

A shortlist built on grade alone can drop an offer that was dimensionally correct and keep one that was not.

Verification step

Require the full standard and revision, plus the outside diameter, wall and length with their tolerance bases, from each supplier.

None of the examples states a tolerance value, a unit weight or a dimensional limit. Those are set by the standard governing your supply, and each example shows the verification step that resolves it rather than a figure this page cannot evidence.

Standards and tolerance context

Which document supplies which part of the row

Dimensions, tolerances and interface requirements come from different documents, and a chart goes wrong the moment they are treated as one. The tables below keep them apart and state the evidence each line depends on.

Scaffolding Pipe Dimensions Chart — dimensional inspection detail
A measured dimension only becomes a specification once it is read against the limits the governing standard defines for that dimension.

What each line of a chart depends on

Every row names its applicability and the verification requirement behind it.

LineWhat it governsVerification requirementRFQ field
Tube product standardGoverns the tube as a product — its dimensional regime, tolerances and testing.Buyer cites the standard and edition the design assumes.Standard / revision field
Coupler standardThe interface reference. It defines coupler requirements — it does not supply every tube dimension.Buyer names the coupler standard and revision.Coupler standard field
Nominal outside diameterA designation used to reference the size. It is not a measured value and carries no limits on its own.Buyer states the nominal figure and its unit.OD field (nominal)
Actual outside diameterA measurement against an instrument at a point in time; it only means something against stated limits.Buyer states the measured value, unit and instrument.OD field (actual)
Tolerance basis for OD and wallSets the permissible variation. Without it, a stated dimension has no defined acceptance limits.Buyer supplies the tolerance source from the accepted standard.Tolerance source field
Length and its basisLength is measured against a stated basis; cut lengths follow the design geometry rather than stock figures.Buyer states the length, unit and the basis it is measured to.Length field
Coating and presented diameterA coating adds to the outside surface, so the diameter presented to the coupler differs from the bare one.Buyer states the finish and confirms the coupler range against the presented diameter.Finish field
Unit weight and mechanical valuesPublished by the governing standard against stated conditions. Not repeated here as chart values.Buyer reads them from the accepted document for the specific supply.Verification requirement

Tolerance and form — where values are deliberately absent

Suppressed values are replaced by the exact input needed to resolve them.

ParameterDecision implicationVerification requirementRFQ field
Outside diameter toleranceThe permissible variation on the diameter the coupler closes on.Not published on this page. Take from the accepted tube standard for the specific supply.Tolerance source field
Wall thickness toleranceThe permissible variation on wall, which the standard defines on its own basis.Not published on this page. Take from the accepted tube standard.Tolerance source field
Length toleranceThe permissible variation on length, which depends on how the length is supplied.Not published on this page. Take from the accepted standard or the agreed cut schedule.Length field
Straightness and ovalityForm variations that affect assembly even where the diameter is within limits.Not published on this page. Confirm which parameters the accepted standard specifies.Verification requirement
Interface dimensionsThe dimension set the coupler is designed around, from the coupler standard.Take from the coupler standard and confirm against the tube as presented.Coupler standard field
Coating buildHow much a coating adds to the presented outside diameter.Not published on this page. Confirm against the coating standard and the coupler range.Finish field

Evidence warning

Numerical chemistry, mechanical properties, tolerances, coating thickness or mass, unit weight, load capacity and dimensional limits are not printed on this page. Each is published by the standard and edition governing your supply, and each has to be read from that document for the specific material. Where a figure is needed to proceed, the row above states the input to supply instead.

Verification and misuse controls

What has to be confirmed, and how the chart gets misused

The first table is the documentation a dimension line depends on — what it verifies, who issues it, when it is needed and what breaks without it. The second is the six ways a dimension chart is most often read wrongly, and the control that prevents each.

Document / testWhat it verifiesSource / issuerWhen requiredDependency
Mill test certificateThe standard, edition and grade the tube was made and tested toCertificate naming the accepted document, traceable to the supplied lotBefore quotation is finalisedThe chart row cannot be tied to the material actually offered.
Dimensional recordMeasured outside diameter and wall against their tolerance basesMeasured record taken against a stated instrumentBefore dispatchA nominal figure stands in for a measurement with no limits attached.
Tolerance sourceWhich document supplies the permissible variation being appliedCitation of the standard, edition and clause in the accepted documentBefore comparison is usedTwo rows are compared against different limits without anyone noticing.
Coupler specificationThe coupler standard, revision and the size range the design depends onCoupler specification checked against the presented diameterBefore order placementThe interface is assumed from matching nominal figures.
Finish documentationThe finish applied and, where coated, the coating standard that appliesFinish record naming the standard and method where a coating appliesBefore dispatchThe presented diameter differs from the one the coupler range was checked against.
Design outputsThe dimensions and tolerances the scaffold design actually assumesDesign drawing or specification from the responsible engineerBefore quotationThe chart is complete but answering a question the design never asked.
Scaffolding Pipe Dimensions Chart — document verification setup
Documents tie a chart row back to the material it describes. A normalized row does not replace them, and it is never offered in place of a certificate.

Common input errors and the control against each

1

Comparing nominal figures across standards

Nominal equivalence is treated as dimensional equivalence, so two rows are marked comparable when their tolerance regimes differ.

Keep the standard and revision attached to every row. The normalizer refuses a comparison while a tolerance source is missing.

2

Treating a measured value as a specification

A single site measurement becomes the acceptance criterion, when a measurement only means something against stated limits.

Record measured values in the actual field and compare them against limits taken from the accepted standard.

3

Averaging mixed units

Values entered in different units are combined without conversion, producing a figure that corresponds to nothing.

State the unit on every field. The normalizer flags a unit mismatch rather than converting silently.

4

Using length as a design dimension

A stock length is treated as the required length, so cut geometry is derived from what was available.

State whether the length is a stock figure or a design cut, and keep the design reference with it.

5

Ignoring the coating in the interface check

The coupler range is checked against the bare diameter when the tube arrives coated.

Record the bare and presented diameters separately and confirm the coupler range against the presented one.

6

Reading the chart as engineering approval

A normalized row is taken as confirmation that a scaffold is adequate, when it establishes nothing of the kind.

Keep the chart as a comparison aid and route adequacy questions to the responsible engineer.

When engineering review is required

A normalized chart row answers a dimensional question. It does not answer whether a scaffold is adequate for the access it provides, whether a load class is met, or whether an interface is safe in service. Those are engineering judgements that belong to the responsible engineer, and a chart — however well sourced — is not a substitute for them.

Product decision handoff

Where the dimensions chart hands over

A dimension row establishes what the tube is dimensionally. It does not choose the tube form. The related page below carries that decision, with its own boundary stated.

Scaffolding Pipe Dimensions Chart — tube and coupler interface context
The interface is the reason outside diameter is checked first — the coupler closes on the tube as presented, not on a nominal figure in a table.

What this handoff cannot tell you

Neither the chart nor the type route establishes load capacity, design adequacy or interface compatibility in service. Those come from the governing standard and the responsible engineer — the page states the input to supply rather than asserting a value it cannot evidence.

GCC product × country routes

Destination input by market

Each market page sets out the commercial route for a scaffolding pipe enquiry into that country — destination, importer, documents, Incoterm and delivery point kept explicit rather than assumed. Ports, charges, transit times and delivery dates are quotation dependent and are not published here.

Delivery inputs

Named place, site access, offloading position and the window the project needs. Each is a field on the enquiry rather than an assumption made at quotation.

Document set

The documents each market requires are stated on the enquiry with their issuers, so the scope is quoted rather than negotiated after order.

Incoterms 2020

The rule is quoted with its named place and port. The Incoterm defines delivery obligations — it does not by itself settle title, payment terms, duty or customs clearance.

Expert insight

An interface-first dimensional check

Decision question

Which dimension matters first when checking scaffold-tube/coupler compatibility?

Method
Use the current coupler standard as the interface reference, then require tube dimensions and tolerances from the governing tube specification.
Information date

Scope, as published

Current BS EN 74-1:2022+A1:2025 governs couplers for scaffold tubes; chart data must therefore preserve the distinction between interface dimensions and product-standard tolerances.

Limitations

  • The coupler standard does not supply every tube dimension or tolerance.
  • Any numerical chart must be sourced row-by-row from an authorized standard or approved manufacturer data.

Buyer implication

Make standard/revision and tolerance source mandatory columns in the dimension chart.

Evidence-led buyer advantages

Buyer concern → evidence → outcome

Four concerns that come up on almost every dimension enquiry, and what actually resolves each one. No superiority claims — the resolution is a process, not a property of the steel.

01

Dimensions compared across standards without anyone noticing

Every row carries its standard, revision and tolerance source, and the normalizer refuses a comparison while any of them is missing.

A shortlist where the rows are genuinely comparable rather than nominally similar.

02

A measured value mistaken for a specification

Nominal and actual are separate fields, and the difference between them is held as an unresolved quantity until limits are supplied.

Acceptance decisions made against the limits the standard defines, not against a raw difference.

03

Mixed units producing a figure that means nothing

The unit is a stated field on every entry, and a mismatch is flagged rather than converted silently.

Calculations that resolve to a real quantity on a known basis.

04

An interface checked against the wrong diameter

The bare and presented diameters are recorded separately, with the coupler range confirmed against what it actually meets.

Couplers and tube that assemble as the design assumed, coating included.

Concern/Evidence or capability required/Procurement outcome

From enquiry to delivery

Six stages, and who owns each

Each stage names the owner, the input it needs, the evidence it produces, the risk of skipping it and the next action. The early stages belong to the technical side of the review, not to the supplier.

Stage 01

Source fixed

Owner: Buyer / technical reviewer

Required input

The tube standard and revision the dimensions will be recorded against.

Evidence / output

A named source for every row that follows.

Risk if missing

Rows collected from different documents and silently treated as one set.

Next action

Cite the standard and edition before entering any dimension.

Stage 02

Dimensions entered

Owner: Buyer / technical reviewer

Required input

Outside diameter, wall and length with their units, each tagged nominal or actual.

Evidence / output

A normalized set with the nominal/actual distinction preserved.

Risk if missing

A measured value recorded in a nominal field and later compared as though it were a designation.

Next action

Enter each value with its unit and its basis.

Stage 03

Tolerance source attached

Owner: Buyer / engineer

Required input

The document and clause supplying the permissible variation for each dimension.

Evidence / output

Dimensions that carry defined acceptance limits.

Risk if missing

A comparison run against limits nobody has actually cited.

Next action

Attach the tolerance source before using any comparison.

Stage 04

Interface checked

Owner: Buyer / technical reviewer

Required input

The coupler standard and size range, against the diameter the tube presents.

Evidence / output

A verified interface rather than an inferred one.

Risk if missing

Assembly stalls on site because the fit was read from nominal figures.

Next action

Confirm the coupler range against the presented diameter, coating included.

Stage 05

Commercial enquiry

Owner: Commercial department

Required input

Quantity with its unit basis, destination, and the Incoterm 2020 rule with its named place.

Evidence / output

A quotation request on a stated basis — price on request.

Risk if missing

A cost difference read as a commercial difference when the offers carry different obligations.

Next action

Hand the copyable specification line to the Scaffolding Pipes enquiry form.

Stage 06

Documents reconciled

Owner: Supplier / buyer

Required input

The document set the project requires, each with its issuer.

Evidence / output

Material arriving with documentation that ties back to the chart rows.

Risk if missing

A consignment that cannot be reconciled against the specification it was bought to.

Next action

Confirm the document scope and issuers on the enquiry.

Buyer FAQ

Post-decision questions

The questions that come up once the buyer has established that source-tagging, not the numbers themselves, is what makes a dimension chart usable.

1

Why can't two tubes with the same nominal diameter be compared directly?

Because a nominal diameter is a designation, not a dimension with limits. Two tubes can both be described as 48.3 mm and still differ in the permissible variation their governing standards allow. Until each row carries its standard, revision and tolerance source, the two figures are not comparable quantities — they only look alike.

2

Which dimension should be checked first for coupler compatibility?

The outside diameter as presented to the coupler, checked against the coupler standard's interface dimensions. Outside diameter governs the fit, so it is the first dimension to establish. Wall and length matter for the system, but they do not decide whether the coupler closes on the tube.

3

Does a measured diameter tell me whether the tube is acceptable?

Not on its own. A measurement only means something against stated limits and a stated instrument. If the permissible variation has not been taken from the governing standard, there is nothing to judge the measurement against — the normalizer holds that difference as an unresolved quantity rather than a pass or a fail.

4

How does a coating change the dimensions I should be comparing?

It adds to the outside surface, so the diameter the coupler meets is larger than the bare diameter. Where a coating applies, the presented diameter is the one that has to be checked against the coupler's size range. Recording only the bare figure leaves the interface check answering a question about a tube nobody is going to assemble.

5

Can this chart replace a mill certificate or a dimensional inspection?

No. The chart is a comparison aid built from data the buyer supplies. A mill test certificate ties the material to the standard it was made to, and a dimensional record evidences what was actually measured. Neither is produced by normalizing rows, and the chart should never be offered in place of them.

6

What should I send if I don't have the tolerance values yet?

Send the standard and revision you intend to work to, and mark the tolerance fields as pending. That is more useful than an assumed figure, because the enquiry can be reviewed against the document you have actually chosen. Guessed tolerances are the one input that makes a dimension chart actively misleading rather than merely incomplete.

Qualified RFQ

Send the dimensions with their sources

An enquiry that arrives with each dimension tagged to its standard and tolerance source can be reviewed technically before it is quoted commercially. The specification line you built above is carried into this form automatically — nothing you entered is discarded.

  • Reviewed against the standard and tolerance source you state, not against a catalogue figure
  • Missing sources reported back rather than silently assumed
  • Price, availability and lead time confirmed on quotation — never published here
WhatsApp +971 56 398 0860sales@noordeirasteel.ae

Contact the commercial department

Monday – Saturday: 8.00 AM – 6.00 PM · Sunday: Closed

Request a quote — scaffolding pipe dimensions

Price on request. No tolerance, unit weight, load capacity or dimensional limit is asserted on this page — each is confirmed against the governing standard on quotation.

Calculation inputs

What a dimension row has to carry before it can be used

A dimension becomes a calculation input only once four things are attached to it. The table below is the same four, stated as the question each one answers and what happens when it is absent.

AttachmentThe question it answersIf it is absentRFQ field
Standard + revisionWhich document defines this dimension and on what basis?The figure describes nothing in particular — two rows from different documents look identical.Standard / revision field
UnitWhat quantity is this number expressing?Values are combined across unit systems and produce a figure that corresponds to no real quantity.Unit field per dimension
Basis (nominal or actual)Is this a designation or a measurement?A measurement is averaged with a designation, or a designation is judged as though it carried limits.Basis field per dimension
Tolerance sourceWhere do the permissible limits come from?The dimension has no defined acceptance limits, so nothing can be accepted or rejected against it.Tolerance source field

Why no conversion is performed for you

Unit conversion is a stated decision with a stated factor and a stated rounding rule. Performing it silently would hide both, and a converted figure that cannot be traced back to its origin is worse than an unconverted one that can. The normalizer flags a mismatch and leaves the conversion — and the record of it — with you.

Worked example patterns

The three patterns behind the examples above

The worked examples are instances of three recurring patterns. Recognising the pattern is what lets you spot the same problem on an enquiry this page has never seen.

The false match

Shape
Two entries agree on a visible value — a nominal size, a grade or a measured figure — and are treated as equivalent.
Where it breaks
Agreement on one field is read as agreement on all of them, when the fields that decide the outcome were never supplied.
Control
Require the full field set on both sides before a comparison is marked comparable. Equality of one value is not equality of a dimension.

The unsourced measurement

Shape
A measured value is recorded and immediately judged — accepted, rejected or averaged — with no limits supplied to judge it against.
Where it breaks
The judgement is made against an expectation rather than against the permissible variation the standard defines.
Control
Hold the measurement as an unresolved quantity until the tolerance source and the instrument are both stated.

The borrowed standard

Shape
A figure is carried from one document or product form into a context governed by another, because the number looks transferable.
Where it breaks
The number is now describing a different material, form or regime than the one it was published for.
Control
Keep the standard, edition and product form attached to every row. A row without them cannot be carried anywhere.

Reference pack

Assemble the record before you compare anything

There is no downloadable chart on this page, and deliberately so — a chart detached from its sources is exactly the artefact this resource warns against. What you can assemble is the record behind each row, and the list below is what that record contains.

  1. 1

    The governing standard and revision

    For the tube as a product — the document every dimension on the row is read from.

  2. 2

    The tolerance source, with its clause

    Where the permissible variation for outside diameter, wall and length is defined.

  3. 3

    The coupler standard and revision

    The interface reference the outside diameter is checked against.

  4. 4

    The dimensional record

    Measured outside diameter and wall against their tolerance bases, taken with a stated instrument.

  5. 5

    The finish record

    Where a coating applies: the coating standard and method, and how the presented diameter differs.

  6. 6

    The design outputs

    The dimensions and tolerances the scaffold design actually assumes, from the responsible engineer.

  7. 7

    The mill test certificate

    The standard, edition and grade the tube was made and tested to, traceable to the supplied lot.

Request the specification set

Send the standard and revision you intend to work to, and the commercial department will confirm what can be supplied against it, with the documents that evidence it. Price on request.

Noor Deira Steel Trading L.L.C. — Office 3303, Churchill Executive Tower, Business Bay, Dubai, United Arab Emirates.