Carbon and carbon-manganese steel
The usual nominal figure for general carbon steel tube.
Confirm the density basis with the governing standard or the mill.
Technical
Tube mass per metre is a calculated figure, not a measured one. It depends on the cross-sectional area derived from the ordered dimensions and on the density assumed for the material — so the same size in two alloy families does not give the same number.
Method
Two inputs, in this order: the cross-sectional area from the dimensions, then the density assumed for the material. Change either and the figure changes.
Density by family
Two tubes of identical dimensions in different material families do not have the same mass. Reusing a carbon-steel figure for an alloy or stainless grade is the commonest error in a tube mass estimate.
The usual nominal figure for general carbon steel tube.
Confirm the density basis with the governing standard or the mill.
Alloying additions change the nominal density slightly from plain carbon steel.
Do not reuse a carbon-steel figure for an alloy grade without confirming it.
Austenitic grades are typically denser than carbon steel at the same dimensions.
Use the density appropriate to the actual grade when handling or freight matters.
Mass per metre follows from the cross-sectional area, which depends on OD and wall together.
Confirm whether OD and wall or OD and ID are the ordered dimensions.
No density value is published on this page. Density varies by grade within a family, so the figure to use comes from the governing standard edition or from the mill — not from a general table.
Limits
A calculated mass is a planning aid. It is not a measurement and not a commercial basis unless the contract says so.
| The claim | The reality | What to do instead |
|---|---|---|
| It equals the delivered mass | Dimensional variation within the permitted tolerances changes the actual mass, and a theoretical figure assumes nominal dimensions throughout. | Treat it as an estimate and confirm the commercial basis in writing. |
| It is an invoicing basis | Unless the contract specifies a theoretical basis, invoicing follows the agreed commercial terms, not a page calculation. | State the quantity basis and the weighing or theoretical basis on the enquiry. |
| It covers the whole order | A per-metre figure says nothing about cutting allowance, end preparation or the mass removed by machining. | Add the processing scope before using it for handling or freight. |
| It is grade-independent | Density varies by family and grade, so an alloy tube and a carbon tube of the same size differ. | Use the density for the actual material, not a default. |
Related pages
Mass is a handling input, not an acceptance basis. The dimensional and material decisions come first.
Grade, heat treatment and product standard across mechanical and thermal duties.
Which dimension governs acceptance and how it is measured.
Dimensional references for tube selection and enquiry preparation.