JIS G 3112 — Standard Page

Which Document Does Your Rebar Schedule Actually Place Against?

A Japanese-governed reinforcement package usually arrives with two document names attached to it rather than one, and the first decision is which of them your bar schedule is actually placing against. JIS G 3112 is the steel bar for concrete reinforcement specification — the document that establishes what the bar must be. JIS G 3117 is the separate specification for the shape, dimensions, mass and tolerances of deformed bars. They are companion documents covering different things, and a schedule that names the bar specification without the deformed-bar dimension specification has not yet said what the bar has to measure. On top of that pairing sit the SD designations your structural drawings carry, which are only meaningful once you know which of the two documents you are reading them in. This page is built to settle that order before you request pricing.

Before you ask for a price

  • Two companion documents usually sit behind a Japanese-governed package, not one.
  • One establishes what the bar must be; the other what the deformed bar must measure.
  • An SD designation is defined inside a document and edition — never by the label alone.

Document scope checked as of

Where A Japanese Enquiry Starts

The designation on the drawing is not the first thing to settle

Japanese-governed reinforcement packages reach a distributor as a bundle of drawing notes, a bar bending schedule and a designation that everyone recognises from the last project. The temptation is to price against the designation, because it is the only short piece of text in the bundle. The problem is that the designation does not identify which document is answering which requirement, and on a package built on two companion documents that gap is where the expensive misunderstandings live.

The bar specification

Establishes what the reinforcement bar has to be. It is the document behind the material side of a mill test certificate, and it is the one most often meant when a schedule says it is governed by the bar specification.

The deformed-bar dimension specification

Establishes the shape, dimensions, mass and tolerances of deformed bar. It is the document behind a dimensional check at goods-in, and it is the one most often assumed rather than named.

The SD designation

A class defined inside a specification and its edition. It records what the design selected; it does not tell you which of the two documents above is answering a given requirement on your schedule.

Your bar bending schedule

The project document that turns the design into cut lengths, bends and quantities. Its revision matters as much as the standard's, and a superseded schedule is a real failure mode rather than a theoretical one.

The routing rule

Read the drawing note first and transcribe the document number exactly as it is printed. If it names one of the two documents, that tells you which half of the requirement you can check and which half is still unstated. If it names both, you are placing against the pairing — the arrangement most Japanese-governed packages are actually built on. If it names neither, the note is not yet a specification, and no amount of quoting will make it one.

See the full rebar range All rebar standards

Bundles of deformed reinforcing bar and right-angle cut bar stacked on the ground at a construction site, showing the deformed surface that the dimension specification governs.
Deformed bar separated into bundles and cut angles. The bar specification answers what the steel is; the dimension specification answers what the deformation, size and tolerance have to be — and a receiving check depends on the second.

Scope & Grade Router

Route the schedule to a document, then check the designation sits inside it

This router takes the document your schedule places against, the packaged product form being shipped and the SD designation your drawings print, and tells you which requirement is actually being answered — plus which records are still unowned. It publishes no mechanical, chemical or dimensional value, because those belong to the purchased edition of the specification and to your own schedule. Where the inputs are not enough to answer, it says so rather than filling the gap with a number.

Document, product form & designation

Required fields marked *

Transcribe the number from the drawing note as printed — do not infer it from the designation.

The form decides which requirements are layered on top of the bar specification.

Recorded exactly as your project prints it. The router supplies no values for it.

Required documents for this consignment

This router does not calculate weight, does not qualify a weld or a splice, does not verify a deformation pattern and does not establish permitted use. Each of those is a separate record, and none of them can be settled from a specification citation.

Routing status

Start with the document the schedule is placing against

A Japanese-governed reinforcement package usually names two documents, and they do different jobs. Until you say which one your bar schedule is placing against, there is no way to tell whether you are checking what the bar must be or what the deformed bar must measure — and those are two different checks against two different texts.

Still to settle

  • Which document — the bar specification or the deformed-bar dimension specification — the requirement being checked actually sits in.
  • The edition the project is bound to, since the designation's meaning is established inside the edition.
  • The product form being shipped as a packaged unit, and whether fabrication requirements travel with it.
  • The SD designation exactly as the structural drawings print it.
  • Who holds each piece of the evidence, and how the deformation pattern is to be verified on the consignment.

Boundaries of this routing

  • JIS G 3112 and JIS G 3117 are companion documents covering different things. One establishes what the bar must be; the other establishes what the deformed bar must measure. Neither replaces the other, and citing one does not import the other.
  • This page publishes no mechanical property, chemical composition, dimension, mass or tolerance value for any designation. Those figures live in the purchased edition of the specification and in your project's own schedule, and they are not substitutable from a web page.
  • An SD designation is meaningful only inside the document and edition that defines it. A comparable-looking designation from another standard family is a different designation, not an equivalent one.
  • Where a project layers national, client or project-specific provisions on top of the specification, those sit alongside it as separate requirements and are not assumed from the designation.
  • A mill test certificate evidences the material in the heat. It does not evidence that the bar was cut, bent or prefabricated to the project's bar bending schedule, and it does not evidence permitted use in the structure.

Nothing is transmitted from this panel. Once the document, product form and designation are settled, send the summary to the commercial department so the offer is built on a fixed basis.

The SD Designation

Four questions sit behind one designation — and two documents answer them

This is the table to read before the first enquiry goes out. Each row is a question the designation appears to answer, the document that actually answers it, what that means when you are checking a consignment, and the action that closes it. Nothing in this table publishes a value: the column on the right is what you do, not what the number is.

The question you are actually askingDocument that answers itWhat it means when you check a consignmentAction to close it
What must the bar be?The bar product specification (JIS G 3112).Establishes the material requirements the bar has to meet. It is the document behind a mill test certificate for the heat.Name this document and its edition with the order.
What must the deformed bar measure?The deformed-bar shape and dimension specification (JIS G 3117).Fixes the shape, dimensions, mass and tolerances of deformed bar. It is the document behind a dimensional check at goods-in.Name this document alongside the bar specification.
Which designation applies?The SD designation your structural drawings print.A designation is defined inside a document and an edition. It is not a free-standing label that means the same thing in every text.Transcribe the designation exactly as the schedule prints it.
What has to happen at goods-in?Your project's inspection and acceptance plan.Nothing in the order fixes how the consignment is verified on arrival. That is a receiving decision your project owns.State the inspection basis before delivery, not after.

Document roles are described to explain the split, not to reproduce requirement text. Confirm exact document titles, numbers, editions and scopes against the publisher and your project specification before specifying. No mechanical, chemical or dimensional values are published here.

Hand marking a fabrication schedule on paper surrounded by technical drawings, a ruler and a calculator, illustrating a bar bending schedule being revised before an order is placed.
A bar bending schedule being marked up. Its revision number governs the cut lengths and bends just as the standard's edition governs the requirements — and a supplier quoting to a superseded revision produces bar that matches the drawing you no longer hold.

Why the split matters commercially

The gap between the two documents is where rework is ordered

When a schedule places against the bar specification alone and the order also includes bending or a prefabricated unit, the bar that arrives can be entirely correct as material and still unusable as the thing the project asked for. The material check passes, the dimensional or fabrication check has nothing to be checked against, and the disagreement surfaces on site rather than at goods-in — where it is measured in delays rather than paperwork. Naming the document that governs each requirement is what closes that gap before the enquiry is issued, and it costs nothing but a reading of the drawing note.

  • A designation carried over from a previous project survives the copy-paste but not the review. Its meaning is fixed by the edition it was defined in, not by the label.
  • A general "JIS rebar" note with no number is not a citation. The router returns it as undefined rather than treating it as a low-confidence match.
  • A cross-family designation that looks comparable is a different designation. Substitution on resemblance is a claim neither document supports.

Ordering Detail & Certificate

What has to be written into the order for the evidence to mean anything

A mill test certificate is only as useful as the requirement it is read against. On a package built on two companion documents, that means the order has to state which document each requirement sits in, because the certificate and the goods-in check are answering different questions and are produced by different parties. Getting the order detail right is what turns a delivery into an acceptance.

Evidence / documentWhat it actually verifiesWho normally holds itEnquiry action
Mill test certificate for the heatThe material in the heat it was tested from, in the terms the specification your order names requires.The delivering millName the document and edition it is to be read against.
Conformity / inspection document for the consignmentThat the delivered lot is declared against the requirement set by the document on the order.The mill or the delivering partyState the content requirement with the order, not after delivery.
Bar bending schedule revisionThe cut lengths, bend shapes and quantities the bar was actually produced to.The project's detailerState the revision being bought to on the order itself.
Dimensional verification recordThe deformed-bar shape, dimension and tolerance check at goods-in.Your project's receiving inspectionAgree who checks it and against which document before delivery.
Fabrication records (bending, welding, assembly)That a fabricated unit was produced to a specified procedure by qualified people.The fabricator or cut-and-bend shopRequest from the fabricator where the order includes fabrication.
Straightening record for coiled supplyThat bar supplied in coil was straightened and the finished bar conforms.Whoever performs the straighteningAssign the responsibility explicitly in the order.

Specify, then check

A certificate is only verifiable against a stated requirement. Write the content into the order so the document that arrives can be assessed rather than filed.

Material versus unit

A mill test certificate evidences material. It does not evidence that the bar was cut or bent to your schedule, and it is not an approval to build with it.

Two parties, one lot

Where fabrication is involved, some evidence is produced at the fabricator rather than the mill. Both records have to reference the same consignment.

Construction foreman checking a building quality checklist report at a house construction site, illustrating the goods-in verification a consignment has to pass.
Goods-in verification against a checklist. The check has to exist before the delivery does — after the fact, the question is no longer what conforms but what to do with a lot that is already on site.

Where This Routing Matters

Three packages where the document split decides whether the delivery is accepted

These are the application settings where a Japanese-governed specification is most often written and where the two-document split carries the most commercial weight — not because the steel is different, but because the packaged product form and the project provisions layered on top are different in each case.

Application fit is confirmed against the document and edition your project cites, the packaged product form and the project's own design rules when the enquiry is quoted. No generic or unsupported suitability claims are made on this page.

GCC Markets & Destination Planning

Fix the destination basis before the JIS enquiry is issued

For each GCC destination the specification, document set and commercial terms are aligned to your project basis at quotation. Because the document and edition govern what conforms, aligning that citation across every source is what makes the offers comparable rather than merely similar on price.

Destination, documents, port or delivery line, Incoterm and the required delivery date are fixed at quotation from your specification. No served markets, local stock, local branches or delivery times are claimed in advance.

Verifiable Outcomes

Each concern mapped to the check on this page, then to what you can rely on

No superiority claims and no equivalence claims. Each row names a specific risk on a Japanese-governed package, the mechanism on this page that addresses it, and the practical outcome that follows.

Buyer concernCheck on this pageOutcome you can rely on
Assuming one document covers the whole packageThe router keeps the bar specification and the deformed-bar dimension specification as distinct inputs and flags an order that places against only one.The check you are running is traceable to the document that actually contains it.
A drawing note with no document numberA general call-out returns an explicit not-fit result rather than a soft caution.Undefined citations are caught before a quotation is built on an assumption.
Fabricated units ordered against the bar specification aloneBent, welded and prefabricated forms trigger a specific prompt that fabrication requirements live elsewhere.The finished unit arrives against a requirement it can actually be accepted to.
A designation read as free-standingDesignation and edition are collected as separate fields, and the router never returns a value for either.No mechanical or dimensional figure is inherited from a page instead of the specification.
Coil straightened without a documented stepA coiled product form returns a prompt that the finished straightened bar is what has to conform.The straightening step is assigned to a party and evidenced rather than assumed.
A mill certificate treated as acceptance of the unitThe evidence section separates what a mill test certificate covers from what the project's own inspection has to cover.Material evidence and unit acceptance stop being one conversation.

From routing to delivery

  1. 1

    Fix which document the schedule places against

    Read the drawing note or specification and transcribe the document number as written, rather than inferring it from the designation.

    Owner:
    Project engineer
    Input:
    Structural drawings, specification
    Output:
    Document identified
    Risk:
    A general call-out read as a specification

    Next: Establish the product form being shipped

  2. 2

    Establish the product form being shipped

    Confirm whether the order is straight bar, bar bent to a schedule, coil to be straightened, or a prefabricated unit, because the requirements layered on the bar specification differ between them.

    Owner:
    Buyer + fabricator
    Input:
    Bar bending schedule, fabrication note
    Output:
    Packaged product form fixed
    Risk:
    Fabrication requirement left unwritten

    Next: Record the designation as printed

  3. 3

    Record the designation as printed

    Transcribe the SD designation exactly as it appears on the drawings, with the edition of the document it is defined in.

    Owner:
    Design authority
    Input:
    Structural drawings, project specification
    Output:
    Designation and edition on record
    Risk:
    Designation carried over from a previous project

    Next: Fix the evidence and acceptance route

  4. 4

    Fix the evidence and acceptance route

    Decide who holds the mill certificate, who evidences the fabrication, and how the deformation pattern is verified at goods-in.

    Owner:
    QA + buyer
    Input:
    Inspection plan, certificate requirement
    Output:
    Evidence route assigned
    Risk:
    Nobody made responsible for a record

    Next: Issue the qualified RFQ

  5. 5

    Issue the qualified RFQ

    Send the summary with the destination, quantity, required documents and Incoterm so the offer is made on the fixed basis rather than on an assumption.

    Owner:
    Buyer
    Input:
    Routing summary
    Output:
    Issuable enquiry
    Risk:
    Offer quoted against an unsettled citation

    Next: Confirm at quotation

Technical reference note

What actually governs a JIS G 3112 review, and what deliberately does not

A source-backed note on the split this page is built around, stated with its source, the date it was checked and its limits.

The fact that changes the review

The governing fact here is structural rather than numeric. Reinforcement under Japanese Industrial Standards is not described by one document: JIS G 3112 is the steel bar for concrete reinforcement specification, and JIS G 3117 is the separate specification for the shape, dimensions, mass and tolerances of deformed bars. They are companion documents, they cover different requirements, and a package that names only one of them has left the other half of the requirement unstated — usually without anyone noticing, because the drawing looks complete.

The second consequence is what neither document does. They define the product. They do not determine permitted use, detailing provisions or any design restriction, and they do not turn a designation into a free-standing label whose meaning travels between editions or between standard families. Keeping the material citation, the dimensional citation and the design basis on three separate records is what prevents a mill certificate — which evidences material — from being read as acceptance of a finished unit or as an approval to build with it.

Primary authority

Japanese Industrial Standards, published by the Japanese Standards Association: JIS G 3112, Steel bars for concrete reinforcement, and JIS G 3117, Steel bars for concrete reinforcement — the specification covering the shape, dimensions, mass and tolerances of deformed bar. Consult the publisher, or your project specification's citation of them, for the applicable edition and its exact scope.

Document scope checked · confirm the applicable edition and its current requirements with the publisher before specifying

What this note does and does not cover

Covers: why the bar specification and the deformed-bar dimension specification are two documents, why an SD designation only means something inside a document and edition, and why the design question sits entirely outside both.

Does not cover: mechanical properties, chemical composition, dimensions, mass or tolerances for any designation, the current edition's full requirement text, your project's design code, or any equivalence to another standard family. Each must be taken from the publisher or the project directly.

Limit: a standards publisher's scope information is a reference, not a substitute for the purchased standard. Nothing here certifies a product, approves a substitution, verifies a deformation pattern, or supplies a value for any designation.

Practical consequence: transcribe the document number from the drawing note, name the companion dimension document as well, record the designation with its edition, state the evidence route with the order, and keep the design basis on the design authority's record.

FAQ

What a project engineer asks before placing a JIS-governed order

Written for the document split that has to be right before the requirement can be checked at all.

Is JIS G 3112 the same document as JIS G 3117?

No. They are companion documents that cover different things and are normally used together on a Japanese-governed reinforcement package. One is the steel bar for concrete reinforcement specification — it establishes what the bar has to be. The other is the specification for the shape, dimensions, mass and tolerances of deformed bars — it establishes what the deformed bar has to measure. Citing one does not import the other, and a package that names only the bar specification has not yet stated a dimensional requirement.

What does an SD designation actually tell me on its own?

Very little, until you also know the document and the edition it is defined in. A designation such as SD 295, SD 345, SD 390 or SD 490 is a class defined inside a specification, and its requirements are established by the text and the edition rather than by the label. This page therefore records the designation as your drawing prints it and does not publish values for it. When a designation is carried over from an earlier project to a later one, the label survives but the basis does not — which is why the edition is collected as a separate field.

Can I treat an SD designation as equivalent to a European or ASTM grade?

Not by the designation, and not from this page. Each standard family defines its own products, its own requirements and its own test regime, and a designation that looks comparable is not a shared designation — the documents behind them are different documents. If your project has adopted a particular specification, the reinforcement should be reviewed against that specification's own text and edition rather than cross-matched on a label. Substituting on a comparable-looking designation is a decision that cannot be supported by either document.

Why does the edition matter if I already know the document number?

Because the requirement sits in the document as revised. Two editions of the same specification can differ in the requirements they set and in what a designation covers, which means a citation without an edition still leaves the applicable text unidentified. Naming the edition is also what makes offers from different sources genuinely comparable, rather than only comparable on price — every source quoting to the same revision is a different situation from every source quoting to a different one.

What does the mill test certificate cover, and what does it not?

It evidences the material in the heat it was tested from, in the terms the specification your order names requires. It does not evidence that the bar was cut, bent or prefabricated to your bar bending schedule, and it does not evidence that the reinforcement may be used in your structure. Those are separate records held by the fabricator and by the project's design authority. Where the order includes fabrication, some of the evidence is produced at the fabricator rather than at the mill, so the two need to be reconciled against one consignment.

Who is responsible for verifying the deformation pattern on delivery?

That is a receiving decision your project owns, and it is worth settling before delivery rather than after. Nothing in the order establishes how a consignment is verified on arrival, and the deformation pattern is exactly the kind of property that is argued about after the fact. Deciding the inspection basis in advance — who checks it, against which document, and what record is produced — turns a post-delivery dispute into a documented step. This page does not supply dimensional values for that check; they come from the purchased specification and your own schedule.

Qualified RFQ

Request a quote for JIS G 3112 Rebar

Copy the routing summary you have built, then send it to the commercial department. The enquiry is ready for review once the document the schedule places against, the packaged product form, the designation as printed, the edition, quantity and destination are complete.

Send to commercial department WhatsApp us

Price, stock, origin and lead time remain quotation-dependent unless current verified evidence is present. A material citation and its certificate do not establish permitted use in your structure.

sales@noordeirasteel.ae +971 56 398 0860

Office 3303, Churchill Executive Tower, Business Bay, Dubai, United Arab Emirates

Monday – Saturday: 8.00 AM – 6.00 PM · Sunday: Closed

Copyable routing summary

Document placed against
To be confirmed
Product form
To be confirmed
SD designation
To be confirmed
Edition
Not stated
Schedule revision
Not stated
Quantity
To be confirmed
Destination
To be confirmed

Add any remaining open items — the companion dimension document, the schedule revision, the evidence holder, availability, price or lead time — as explicit fields before sending.