Exported from the UAE
Means: The commercial origin of the transaction is a UAE loading point.
Does not mean: It does not by itself state where the steel was rolled.

Destination · Algeria
Request a bulk or project rebar quotation for Algeria; specify the bar, quantity, destination and FOB, CFR or CIF basis.
UAE / Dubai / Jebel Ali export supply may be offered only after availability and terms are confirmed for your enquiry. Nothing on this page is a stock position or a guaranteed loading.
Specification-led enquiry — no price is issued until availability, route and evidence scope are confirmed
What this page sets up
An overseas grade designation is not translated into a local approval on this page. Equivalence is an acceptance question for your engineer and your importer.
Product · Available Rebar
This page covers steel rebar — reinforcing bar for concrete, which most enquiries specify in its deformed form. Local terminology varies, and that difference is worth settling early.
Enquiries into Algeria frequently use iron rod for what the drawings and the mill certificate call reinforcement bar. The two terms are used interchangeably in everyday trade and are not interchangeable in a purchase order. The precise steel specification — form, standard, edition, grade, dimensions and tolerance basis — governs the quotation. State the schedule rather than the everyday term and the offer can be written against it.
Deformed bar is the form most often specified for roads and infrastructure works. Other forms are requested on some projects — state the form you need and it is treated as a question to confirm, not an assumption.
No diameter, grade, standard, length or tonnage is published on this page as available. Those values are confirmed against the offered lot. If they are open, the RFQ below carries them forward as questions rather than filling them in with a guessed range.
Specify these in your RFQ
Each row separates what the buyer states from what the quotation is then obliged to confirm. Two offers cannot be compared unless both are written on the same basis.
| Aspect | What the buyer states | What the offer confirms |
|---|---|---|
| Product / form | Reinforcing bar — most enquiries arrive as deformed bar. "Iron rod" is common local terminology and is read as rebar unless the enquiry states otherwise. | Confirmed as the exact form offered for the lot, stated in the quotation. |
| Standard / edition | Name the Algerian standard or project-specified equivalent, and the edition year it is cited at. | Stated for the offered lot. No equivalence to another standard is assumed. |
| Grade | The designation on the drawings — not a nearest overseas equivalent. | Stated for the offered lot. Grade interchangeability is not offered as a default. |
| Diameter / length | The full size and length schedule, item by item. | Matched against the schedule in the offer, with anything unavailable flagged as a question. |
| Tolerance / mass basis | Name the basis the delivered quantity will be measured against. | Stated explicitly so the invoiced mass and the received mass are on the same footing. |
| Quantity | Metric tonnes, with the theoretical or actual basis stated. | Quoted against that basis; the offer is not silent on which one applies. |
| Marking / bundle ID | What the project and the receiving point expect to see on the bar and the bundle tag. | Confirmed for the lot before dispatch, not after arrival. |
| Required evidence | The certificate and inspection scope the project will accept at goods-in. | Confirmed as available or not available for that lot — subject to confirmation with the offered lot. |
Scroll the table sideways to see every column.

The bar has to identify itself against the order
Rolling mark, bundle tag and heat identity are what connect the delivered steel back to the certificate describing it — and to the engineering order it was bought against.
Editorial illustration of an industry practice. It does not depict Noor Deira Steel material, records or facilities.
UAE · Dubai · Jebel Ali Supply
Export point, stock location and mill origin are separate commercial facts. Buyers who conflate them end up comparing offers that were never equivalent to begin with.
Means: The commercial origin of the transaction is a UAE loading point.
Does not mean: It does not by itself state where the steel was rolled.
Means: Material is physically held at a named Dubai location at the time of the offer.
Does not mean: It is not a statement of stock depth, size range or tonnage.
Means: The rolling mill origin is genuinely and verifiably in the UAE.
Does not mean: It is not implied by the export point. The two are separate facts.
This page does not state that material is currently available for export from UAE / Jebel Ali, does not claim Dubai rebar stock, and does not claim UAE manufacturing origin. Each is confirmed against your enquiry and stated in the offer when it applies. Loading from a particular UAE port is not guaranteed for every enquiry.
Three questions to settle early
The RFQ below asks for this directly. It is the part of the enquiry most often left implicit, and the part that most often changes the answer.
Supply to Algeria · Logistics
A named loading point and a named destination are what turn a shipment intention into a comparable price. Neither can be quoted from a country name alone.
Five inputs the RFQ needs
Discharge-port quotation and delivery to a site are different obligations. If you need the material at an inland point, say so — it is priced and confirmed separately, not folded silently into a port rate.
Incoterms, plainly
Each term is defined against the named place in your offer. Three letters on their own do not define anything.
FOBFree On Board
Covers: The material is placed on board the vessel you nominate at the named UAE loading port.
Excludes: Sea freight, discharge, destination clearance and onward inland movement.
CFRCost and Freight
Covers: Freight to the named destination port is included in the price for the basis quoted.
Excludes: Marine insurance, discharge handling and inland delivery beyond the named port.
CIFCost, Insurance and Freight
Covers: Freight plus marine insurance of the agreed scope to the named destination port.
Excludes: Import clearance, duty, discharge handling and inland movement unless separately quoted.
No port, sailing schedule, route, freight charge or inland delivery service is assumed or published here. All of it is confirmed as part of the quote.
| Decision | What the buyer names | What the quote confirms |
|---|---|---|
| Loading basis | FOB at a named UAE port, or EXW if you arrange collection | The loading point the offer is written against |
| Destination basis | CFR or CIF at your named Algerian port | Freight feasibility and the freight-inclusive price |
| Discharge point | The Algerian port you will clear through | That port as the named place in the offer |
| Onward movement | The inland city, town or project site | Whether onward delivery can be quoted, as a separate line |
| Timing | The date the material is needed | Whether that date is achievable for the lot |
| Importer handoff | Who clears and who receives at port | The document set issued against the consignment |

The named place makes the offer comparable
The port or delivery point and the trade rule that applies to it are what turn a shipment plan into a comparison basis. An offer that names neither is only half a basis.
Editorial illustration of an industry practice. It does not depict Noor Deira Steel operations, a booked route or a confirmed sailing.
Price · Quotation
Plainly: no fixed price per MT is available on this page, and none is invented here. The current quote depends on your specification and your commercial basis.
What the per-MT figure depends on
01Diameter and grade
The size and mechanical class schedule directly change what is being priced.
02Standard and edition
The governing standard sets the chemistry, mechanical class and marking convention.
03Quantity in MT
Tonnage changes the commercial basis, and the theoretical or actual basis has to match.
04Actual origin and availability
Where the lot is drawn from, at the time of the enquiry, is part of the price.
05Named loading and destination points
A bare country promise is not priceable. Named places are.
06Incoterm and freight
FOB, CFR and CIF are three different commercial offers, not three labels for one.
07Inspection and sampling
Third-party inspection and any sampling plan add scope, cost and time.
08Document requirements
Certificates, origin documents and conformity evidence are part of the offer scope.
An indicative or “from” price is not shown because it would be a number you could not transact. A price per MT is issued once the specification, the tonnage, the named places and the Incoterm are on the table.
If your requirement is a full bar schedule, a tender BOQ or a multi-line package, send it through the RFQ rather than summarising it. A schedule carries the size, grade, length and quantity detail that a paragraph cannot, and it is what the quotation is actually written against.
What you can ask to be priced
Only commercially feasible options are presented in the eventual offer. If a basis cannot be supported for your lot, it is said plainly rather than quoted anyway.
Related reading
Standards · Quality · Documents
Five items decide whether a consignment is ready to move: the accepted reference, any equivalence claim, the marking, the certificate scope, and the sampling plan. An unknown equivalence stays an approval question — it does not become an assumption.
Reconciliation gate
0 of 5 items known
5 items still open. Where the accepted reference or an equivalence claim is unconfirmed, the consignment is not ready to move — those are resolved with your engineer and importer before dispatch, not at the port.
No overseas grade is presented here as equivalent to an Algerian designation. Where an equivalence is proposed, it is shown as an open approval question for the buyer, engineer or authority — never as an automatic conversion.
Who confirms what
Regulatory and conformity scope for the exact product and shipment is confirmed by the importer and the project engineer. The supplier states what the offered lot carries. This page does neither on their behalf.
Importer / project engineer
The accepted Algerian standard or project-specified equivalent, the conformity route, permits and acceptance.
Buyer
The evidence package the project will accept at goods-in, and the sampling or inspection scope required.
Supplier
The specification, marking, test evidence and document scope actually available for the offered lot.
Primary source
The catalogue is published as Version 31 December 2025. Confirm the current reference directly with IANOR before relying on it — a catalogue listing is not shipment approval.
The catalogue page carries no guidance about verifying search results, and no product-scope statement for rebar or construction steel. Treat the applicable reference as a question for your engineer.
What can be asked for, what it applies to, and who confirms it. Nothing in this table is a statement that any item is currently available.
| Document / inspection item | Scope it covers | Confirmed by |
|---|---|---|
| Mill test certificate / mill test records | Certificate scope and test evidence for the offered lot. | Requested by the buyer; confirmed against the offered lot.Subject to confirmation with the offered lot |
| Specification statement | The standard, edition, grade and dimensional basis the lot is supplied against. | Requested by the buyer; confirmed in the offer.Subject to confirmation with the offered lot |
| Packing list | Bundle count, packing form and the mass basis used. | Requested by the buyer; issued with the consignment.Subject to confirmation with the offered lot |
| Commercial invoice | Value, Incoterm and the named places the offer is built on. | Requested by the buyer; issued by the supplier.Subject to confirmation with the offered lot |
| Origin documentation | Where applicable to the destination's import requirements. | Requested by the buyer; confirmed for the lot before dispatch.Subject to confirmation with the offered lot |
| Export documents | The documents required to move the consignment out of the loading point. | Requested by the buyer; confirmed for the shipment.Subject to confirmation with the offered lot |
| Third-party inspection | Scope, method and timing, if the project requires a witnessed inspection or sampling plan. | Nominated by the buyer; accommodated against the lot if feasible.Subject to confirmation with the offered lot |

The evidence is committed before the steel is staged
By the time reinforcement reaches a civil structure, the accepted reference, grade, marking and certificate scope are already fixed. The receiving check verifies them — it cannot create them retrospectively.
Editorial illustration of an industry practice. It does not depict a Noor Deira Steel project, client or site.
This is an RFQ and document-planning checklist, not legal, customs or regulatory advice. The importer or project engineer confirms the applicable Algerian standard or accepted equivalent, the conformity route, permits and inspection requirements for the exact product and shipment before dispatch.
No third-party inspection service is offered or implied by this page. Inspection and sampling scope is requested by the buyer and confirmed against the offered lot during quotation. Noor Deira Steel is not the standards authority, the certifier, the customs broker or a local stockist, and this page does not claim any of those roles.
How to Order
Short, and in order. Each step produces something the next one needs, which is why the sequence matters more than the speed.
Start the enquiry with the buyer details and the commercial basis you want quoted.
The designation on the drawings, with the edition year the project works to.
Tonnes, with the theoretical or actual basis stated.
The discharge port and the inland city or site you need the material at.
A named place is what makes the offer comparable to another offer.
No price is issued before availability, route and the evidence scope are checked.
No response-time promise is made here. The quotation is issued once feasibility and evidence are confirmed.
If the project requires sampling or witnessed testing, raise it at step two rather than after the offer. Inspection scope affects both the price and the timing, and it cannot be added retrospectively.
Request Rebar Quote
This collects a comparable specification and route. It does not return a price, a stock position or a delivery promise — a person reviews the enquiry and responds on the basis you state.
RFQ summary
This is exactly what your enquiry currently contains. Anything still open stays visibly open rather than being guessed at.
The copy includes only what you have entered. If you would rather raise the enquiry directly, send it to sales@noordeirasteel.ae.
Contact Options
The RFQ form above is the fastest route for a priced enquiry because it carries the specification. These are the direct channels if you would rather talk first.
Noor Deira Steel Trading L.L.C. is headquartered in Dubai, UAE. Algeria is a destination market served from here — there is no local Algeria office, and this page does not claim one.
FAQ
Short answers, each one honest about what is confirmed against your enquiry rather than assumed on this page.
The route exists as an RFQ for UAE export supply. Whether any specific size, grade or tonnage can be offered for your Algeria shipment depends on the lot and the route, so it is confirmed against your enquiry rather than promised on this page.
Yes — name the Algerian destination port and the enquiry can ask for CFR or CIF against that named place. The quote is issued only if the freight and route are feasible at the time.
No size, grade or standard is published here as in stock or available. State what your project requires and it is confirmed against the offered lot.
Bulk and project tonnages are quoted on enquiry. State the MT quantity and whether it is measured on a theoretical or actual basis, and availability at that tonnage is confirmed against the offered lot.
Both can be requested. Each is confirmed for the offered lot — subject to confirmation with that lot — rather than assumed available at the time of the enquiry.
Give the size, grade, MT quantity, a named destination and the Incoterm you want quoted. Those five inputs are what make a per-MT figure meaningful.
Export supply can be arranged from the UAE. That is separate from where the steel was manufactured — the export location and the mill origin are two different facts, and both are stated explicitly when relevant.
The technical fields — form, standard, edition, grade, sizes, lengths — and the commercial fields — quantity, destination, Incoterm, required date and any document or inspection scope.
Name the destination port you nominate and freight feasibility is confirmed in the quote. The enquiry should state the port you actually intend to clear through — this page does not assume one for you.
Where to go next, depending on what is still open. Each destination covers a different decision.
The continental route covering every destination market we publish.
Open the routeThe regional grouping Algeria sits inside.
Open the routeThe neighbouring North African destination route.
Open the routeThe adjacent North African destination route.
Open the routeCore product scope before narrowing to a form, size or evidence route.
Open the routeHow the export process works rather than what the product is.
Open the routeCheck a size schedule against a stated basis before writing it into the enquiry.
Open the routeMass reference for planning. Final ordered mass follows the agreed standard and tolerance basis.
Open the routeThe application route where the works condition changes the requirement.
Open the routeThe full quotation desk route on this same domain.
Open the routeSend the bar form, diameter and length, grade with standard and edition, quantity in MT, the destination port or inland site, the Incoterm you want quoted, and any document, sampling or inspection scope your project requires. Include the reference and any equivalence your engineer has accepted and the enquiry is ready for review.
Commercial desk